Portfolio Management using Primavera P6 through Web Integration

Main Article Content

Anuja Narayanan
Mathesh Raja Sankar

Abstract

Increase in population increases the demand for dwelling with a greater comfortness with all amenities. Nowadays people require residential building with fitness center, balconies, laundry room, swimming pool, childcare center, playground, and community room. The demand of people initiated to construct a apartment buildings in major cities. The process of planning and schedule of the activities in the construction of apartment building should be in a logical and systematic manner which is done using Autocad and Primavera P6 software. Finally the web integration is done for scheduling the major resources in the construction work which in hand manage the time period effectively.

Downloads

Download data is not yet available.

Article Details

How to Cite
[1]
Anuja Narayanan and Mathesh Raja Sankar , Trans., “Portfolio Management using Primavera P6 through Web Integration”, IJSEPM, vol. 1, no. 2, pp. 1–7, Dec. 2023, doi: 10.54105/ijsepm.B9004.071221.
Section
Articles

How to Cite

[1]
Anuja Narayanan and Mathesh Raja Sankar , Trans., “Portfolio Management using Primavera P6 through Web Integration”, IJSEPM, vol. 1, no. 2, pp. 1–7, Dec. 2023, doi: 10.54105/ijsepm.B9004.071221.
Share |

References

Tom, Andrew Fernans, and Sachin Paul. "Project monitoring and control using primavera."International Journal of Innovative Research in Science, Engineering and Technology 2.3 (2013): 762-771.

T. Subramani, A. Sarkunamand J. jayalakshmi “Planning and Scheduling of High Rise Building using Primavera” ISSN: 2248-9622, Vol. 4, Issue 6 (version 5), June 2014, pp. 134-144.

RhutaJoshil, Pros. V. Z. Patil (2013) “Resource Scheduling Of Construction Project: Case Study” International Journal of Science and Research

Andrew Fernans Tom, Sachin Paul (2013) “Project Monitoring And Control Using Primavera” International Journal of Innovative Research in Science, Engineering and Technology

Ragendra, (2016), "Schedule Control of an Apartment Building using Primavera Techniques", International Journal of engineering research and technology, 5(6), pp: 822- 825 [CrossRef]

T.Subramani, (2015), "Construction Management and Scheduling of residential building using primavera", International Journal of application in engineering and management, 4(5), pp: 188-198.

Unmesh. Y. Polekar(2015),"Planning, Scheduling, and Tracking of a residential Project using Primavera Software", International Journal of advanced research in computer science and management studies, 3(5), pp:227-236.

Patil, (2013), "Resource Scheduling of construction project: a case study", International Journal of science and research, 4(5), pp: 563-568.

HamedZiaidoostan, (2013), "Using Primavera software in resource allocation and project evaluation of construction project

Vignesh , “Resource optimization of construction project using primavera p6”, Iosr journal of mechanical and civil engineering (iosr-jmce) e-issn: 2278-1684,p-issn: 2320-334x, Vol. 14, issue 1, 2017, pp 01-08. [CrossRef]

Most read articles by the same author(s)